PV system (9.6 kWp) on outbuilding of EFH

with TrinaSolar modules, Fronius inverter and 7.7 kWh battery
Location: Rheinfelden-Minseln
Client: Private
Commissioning: 2023

greenUP services:
- Simulation and design of the plant
- Ordering the plant components
- Installation advice

Assembly of the PV mounting frame and the modules in own performance
Acceptance of the PV system by a master electrician on site

 

en_GB