Term: September 2022 - March 2023
Editing/greenUP services: Katja Erdmann / Works planning LPH 5
Design & Client: Oliver Marxen Architecture
Another special feature is the underlying statics. Due to overhangs and slopes, this was a great challenge in a small area, so that the exterior still radiates a deliberate simplicity.
The construction consists of a timber frame building with cellulose insulation, timber cladding and an earthen plaster in the interior. The extension is co-supplied by the main building.