Solar
Capacity: 5.2 kWp divided between four household connections, throttled to 800VA
Commissioning: 2024
Capacity: 5.2 kWh
Commissioning: 2024
Capacity: 7.0 kWh
Commissioning: 2024
Capacity: 7.0 kWh
Commissioning: 2024
Development of a climate-neutral energy refurbishment concept for the Brotfabrik socio-cultural centre in Bonn Beuel with the following components:
- Energetic refurbishment of the building envelope to a kfW70 standard
- 200 kW PV system with 200 kWh electricity storage tank
- Water-to-water heat pump 100 kW for heating and cooling purposes
- Rapeseed oil peak load boiler 30 kW
- Heat accumulator with 50 m³ volume
Construction with renewable or recycled building materials. In the course of the energy-efficient refurbishment of the building sample, barrier-free access to all public spaces is to be created. In addition, a concept is to be implemented to retain and infiltrate as much rainwater as possible on the site in the future, so that the connection to the public sewage system is no longer needed, the groundwater is enriched locally and the sewage system is relieved.
Implementation is scheduled to take place between 2024 and 2028.
System with inverter and PV modules with an output of 5.22 kW peak on a flat garage roof. Location: Bonn Beuel Client: Private Commissioning: 2023 greenUP services: - Simulation [...]
The aim of the work is to develop an energy concept with which the laboratory building can be supplied with renewable energy as self-sufficiently and climate-neutrally as possible all year round. There are already projects in operation for similar commercial buildings and at neighbourhood level. However, these have so far been new buildings. The aim of this work is to simulate the possibility of a climate-neutral energy supply for a single energy-autonomous analytical laboratory in an existing building that is about 100 years old and to make recommendations for implementation.
System with inverter, wallboxes and PV modules with an output of 5 kW gets an update because two e-cars are to be integrated.
Location: Rheinfelden-Herten
Building owners: Private
First commissioning: 2013
greenUP services:
- Simulation and design of new plant components
- Ordering the new plant components